Skip to main content
Skip table of contents

Period Check for Rigid Basement Assumption

For rigid basement story structures, the required period control in TBDY 2018 Article 3.3.1.1.b is automatically performed in the program and is  given under the heading "Period Check for Rigid Basement Assumption" in dynamic analysis reports.

Usage steps:

  • Analyze after defining the rigid story structure.

  • Get a dynamic analysis report.


JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.